The team have been adapting to the non-cyclic set-up required due to Swak4foam not working. The team aim to have all results by the end of Week 12, as planned. The automation section has been completed with Allrun scripts all ready for the final simulations.


The ANSYS results were completed and hence a comparison study can be made between OpenFOAM and ANSYS Fluent.


As the mesh was completed last week, a mesh convergence study was undertaken to show the difference in quality of results dependent upon the refinement of the mesh and to also show that even though our final mesh is not fully refined, it still gives very good and valuable results.

Recent Posts

See All
Week 12 Update

Week 12 has seen the project come to completion with enormous success. The mesh convergence study was completed and demonstrated how the...

 
 
 
Week 10 Update

In Week 10, the continuation of the ANSYS study was conducted with the expectation that all results are gathered by the end of next week....

 
 
 
Week 9 Update

Since the modelling of the project was complete, the team decided to reassign roles for the last few weeks. One member of the modelling...

 
 
 

Comments


© 2023 by Name of Site. Proudly created with Wix.com

bottom of page