Week 12 Update

Week 12 has seen the project come to completion with enormous success. The mesh convergence study was completed and demonstrated how the...

Week 11 Update

The team have been adapting to the non-cyclic set-up required due to Swak4foam not working. The team aim to have all results by the end...

Week 10 Update

In Week 10, the continuation of the ANSYS study was conducted with the expectation that all results are gathered by the end of next week....

Week 9 Update

Since the modelling of the project was complete, the team decided to reassign roles for the last few weeks. One member of the modelling...

Week 8 Update

Week 8 saw the team complete the final geometry for the simulations. The 3-pin model was made with the fluid also modelled. All required...

Week 7 Update

Week 7 saw the team make great progress in all aspects of the project. The modelling team tested the splitting up of faces for extraction...

Week 6 Update

During Week 6, the team submitted the Statement of Purpose to the University of Strathclyde for marking. The team expect results from the...

Week 5 Update

During Week 5 the team made the main preparations for the Interim Report due at the end of the month. This report outlines the project...

Week 4 Update

Week 4 saw the team make good progress within all aspects of the project. The modelling team have now got access to PythonOCC which is a...

Week 3 Update

Week 3 saw the team make great progress in developing their OpenFOAM skills. The team successfully ran a conjugate heat transfer...

Week 2 Update

During Week 2, the team began to research the background of the project and we started tutorials on OpenFOAM. Progress was made on...

Week 1 Update

We started the project with an introductory meeting with our project advisor, Dr Sebastian Spring. He proposed two different project...